Core Insight 01
WWW.CERAMIC-MOLDING.COMPrecision Ceramic Injection Molding Solution
Does Your Part Actually Need Ceramic CIM?
When complexity, precision, and material properties converge — ceramic injection molding is the only path.
Core Insight 02
Black and white is a two-mold problem
It's not a cost negotiation — it's a physical constraint. Black and white zirconia shrink at different rates, so one mold can never satisfy both colors' dimensional requirements.Core Insight 03
Ceramic is weakest before it's finished, not after
Engineers expect "ceramic is hard" — but at demolding, the green body's strength is far below the sintered part's. The design constraints come from the forming process, not the final material.01
DFM Design Guide
DFM · 01
The Minimum Wall Thickness Is Set by the Weakest Stage of the Process, Not the Sintered Material's Strength
DFM · 02
±0.05mm Is the Output of Specific Conditions, Not a Default Capability
DFM · 03–07
Gates · Undercuts · Surfaces · Curved Surfaces · Threads
DATA EVIDENCE
02
Process Capability
Wall thickness capability
0.4–2.5mm0.4mm absolute machinable minimum; 0.7–2.5mm recommended range to prevent sink marks; ribs at 40–50% of nominal wall thicknessGeometric capability
50×70mmXY-plane upper reference limit · blind-hole depth-to-diameter ratio ≤1.5:1 · through-hole ≤3:1.Surface capability
Ra 0.02μmHigh-gloss floor · achieved via 72-hour ball-mill polishing · grade must be marked on the drawing.Medical-specific
Sterilization feasibilityEO sterilization — no risk. Gamma 50kGy discoloration is reversible.03
Process Chain Steps
01
Powder & feedstockBatch prep02
Tooling design2-4 wk03
Injection moldingSeconds/shot04
Debinding~36 hr05
Sintering1500°C · ~36 hr06
Tumbling polish~48-72 hr07
OGP·CT checkFinal QCA single ceramic CIM production batch takes at minimum roughly 7 to 10 days — tens of times longer than plastic injection molding. If demand suddenly doubles or a product reaches end-of-life early, a furnace load already in the kiln cannot be stopped mid-cycle, and work-in-process losses are unavoidable. This is a physical floor of the process, not a capacity issue. Projects with a planning visibility window under 6 to 8 weeks are not a good fit for CIM.
04
Quality Diagnostics · Whitepapers
FOUR FEATURED QUALITY DIAGNOSTICS
Invisible before sintering, irreversible after — a three-step physical mechanism.
Hidden knit lines in dense hole-array parts, detectable only by CT.
R-fillet cut cracking by 80%, backed by real drum-drop test data.
Density gradient plus lack of sidewall constraint — gate design is the root-cause fix.
05
Quick Project Fit Self-Screen
8 Kinds of Projects We Don't Take
Direct material substitution — taking a metal/plastic drawing and requesting ceramic production without structural redesign
Purely appearance-driven, needs evaluation — no functional requirement, "ceramic just looks premium"
Exact color matching — requiring ceramic color to match a plastic Pantone number
Highly volatile demand — planning visibility under 6–8 weeks, or a risk of sudden ramp-up / early end-of-life
Is Your Part a Fit for CIM?
No drawings required, no complete spec sheet needed. Tell us your part's functional requirements, rough dimensions, and expected annual volume — we'll give you a clear feasibility judgment within 3 business days.
PAID DFM ASSESSMENT $500–$1,200 · FEE 100% CREDITABLE TOWARD A FUTURE ORDER